TIMBER FRAMES

Load & Non-Load Bearing

One of the UK’s Leading Timber Frame Suppliers

timber-frames.jpg
195.JPG

External Load-bearing Wall Panels

Utilising project specific architectural design drawings which are computer generated, Frame Work Synergies Ltd ensure that all projects are constructed to the highest standards and to the most efficient use of materials.

 

All External Wall Panels are manufactured according to signed off design drawings and of the highest of standards from PEFC/FSC Certified CLS treated timber in either 140x38mm or 89x38mm timber studs and sheathed with a structural 9mm OSB board tested to BS EN 12871 Wood-based panels for use in floors, walls and roofs, covered with preamble waterproof membrane, meeting all current TRADA, NHBC and Build Regulations requirements as well as following the main code of practice relevant to timber frame construction, BS 5268 – The structural use of timber, or Eurocode 5 – Design of timber structures.

All designs are undertaken to meet client required U – Values to ensure that the product supplied meets all requirements, with Insulation either pre-fitted with our factory or supplied loose for site installation.

E-mail your project specification and detailed CAD drawings to our design team, who will be delighted to discuss your project and assist in fully producing a system that will meet all your requirements.

Internal Load-bearing and Non-load-bearing Wall Panels

Utilising project specific architectural design drawings which are computer generated, Frame Work Synergies Ltd ensure that all projects are constructed to the highest standards and to the most efficient use of materials.

All Internal Load-Bearing and Non-Load-bearing Wall Panels are manufactured according to signed off design drawings and of the highest of standards from PEFC/FSC Certified CLS treated timber in 89x38mm timber studs and sheathed with a structural 9mm OSB board or mid-height noggins as structurally required.

All panels are delivered to site on Articulated Lories (where possible) and erected by our directly employed site erect teams to meet your required build programme.

Once the building is wind and water tight, internal follow-on trades can commence the fit-out, while the external finish is progressed which results in shorter over-all build durations..